The Redwoods Centre

Approx. Value: £1.5M Duration: 52 Weeks Location: Shrewsbury
  • Contractor: BAM Construction
  • Architect: Nightingale Associates
  • Client: South Staffordshire & Shropshire NHS
  • Value: £1.5M
  • Duration: 52 Weeks
  • Location: Shrewsbury
  • Sector: Commercial

Construction of new mental health hospital spread across four individual buildings was designed to provide all levels of care to mental health patients in the Shropshire area.

The internal plastering and dry lining works were designed and specified to meet increased durability and performance across all areas. This was achieved by lining the partitions and walls with the Rigidur H High impact board with a Dura Finish plaster coat to partitions and solid masonry walls. Ceiling areas were lined by using various MF solutions to meet the fire requirements and Gyptone Lay in grid ceilings to provide acoustic absorption.

We operate throughout The Midlands, The northern Home Counties & Central London

We have two offices located
across the United Kindom.

Call or email us about your next project.

Head Office

Units 9 & 10 Bickford Trading Estate, Bickford Road,
Birmingham, B6 7EE

London Office

5 Maidstone Buildings Mews,
72-76 Borough High Street, London, SE1 1GN

Case Studies

About us

Our team

Copyright © CG Reynolds Ltd. All Rights Reserved
Created by Gritt & Co